Innovation and Design
Max Pts: 11 Planned: 3 Actual: 0 Pre-reqs: 2/3
ID 1.1 Prelinary Rating - Prereq
Done
ID 1.2 Intergrated Project Team
Max Pts: 1 Planned: 0
ID 1.3 LEED Professional
Max Pts: 1 Planned: 0
ID 1.4 Design Charette
Max Pts: 1 Planned: 0
ID 1.5 Building Orientation for Solar Design
Max Pts: 1 Planned: 0
ID 2.1 Durability Planning - Prereq
Done
ID 2.2 Durability Management - Prereq
On-going
ID 2.3 Third Party Durability Management Verification
Max Pts: 3 Planned: 3
ID 3 Innovative and Regional Design
ID 3 Innovative and Regional Design
Max Pts: 4 Planned: 0
Location and Linkages
Max Pts: 10 Planned: 10 Actual:10 Pre-reqs: 0
LL 2.1 Site Selection
Max Pts: 2 Planned: 2 Actual: 2
LL 3.2 Infill
Max Pts: 2 Planned: 2 Actual: 2
LL 3.3 Previosuly Developped
Max Pts: 1 Planned: 1 Actual: 1
LL 4.1 Existing Infrastructure
Max Pts: 1 Planned: 1 Actual: 1
LL 5.3 Outstasning Community Resources
Max Pts: 3 Planned: 3 Actual: 3
LL 6.1 Access to Open Space
Max Pts: 1 Planned: 1 Actual: 1
Sustainable Sites
Max Pts: 22 Min Pts: 5 Planned: 12.5 Actual: 0 Pre-reqs: 0 / 2
SS 1.1 Erosion Control during Construction Pre-req
SS 1.2 Minimize Disturbed Area
Water Efficiency
WE 3.1 Fixture Efficiency Pre-req
EA 9.2 Water Efficient Clothes Washer
Material & Resources
Indoor Environmental Quality
AE 1.1 Basic Operations Training - Pre-req
SS 1.2 Minimize Disturbed Area
Max Pts: 1 Planned: 1
SS 2.1 No Invasive Plants Pre-req
SS 2.1 No Invasive Plants Pre-req
SS 2.2 Basic Landscape Design
Max Pts: 2 Planned: 2
SS 2.3 Limit Conventional Turf
Max Pts: 3 Planned: 1
SS 2.4 Drought Tolerant Plants
Max Pts: 2 Planned: 1
SS 3.1 Reduce Heat Island Effect
Max Pts: 1 Planned: 1
SS 4.1 Permeable Lot
Max Pts: 4 Planned 3
SS 4.2 Permanent Erosion Controls
Max Pts: 1 Planned: 1
SS 4.3 Management of Runoff from Roof
Max Pts: 2 Planned: 1
SS 5.1 Pest Control Alternatives
Max Pts: 2 Planned: 0 Revised: 1.5
SS 6.1 - 6.3 Housing Density
Max Pts: 4 Planned: 0
Water Efficiency
Max Pts: 15 Min Pts: 3 Planned: 6 Actual: 4 Pre-reqs: 1 / 1
WE 1.1 Rainwater Harvesting & 1.2 Greywater Reuse System
Max Pts: 5 Planned: 0
WE 2.1 High Efficiency Irrigations System or 2.3 Reduce Irrigation Demand
Max Pts: 4 Planned: 0
WE 3.1 Fixture Efficiency Pre-req
Done
WE 3.3 Very High Efficiency Fixtures
Max Pts: 6 Planned: 5 Revised: 6 Actual: 4
Energy & Atmosphere
Max Pts: 38 Min Pts: 0 Planned: 6.5 Actual: 13 Pre-reqs: 2 / 2
EA 1.1 Minimum ERS Rating of 76 Pre-req
Done
EA 1.2 Exceptional Energy Perfromance in ERS
Max Pts: 28 Planned: 6 Actual: 10
EA 7.1 Efficient Hot Water Distribution
Max Pts: 2 Planned: 0
EA 7.2 Pipe Insulation
Max Pts: 1 Planned: 1
EA 8.1 ENERGY STAR Lights Pre-req
Done
Done
EA 8.3 Advanced Lighting
Max Pts: 3 Planned: 0 Revised: 1.5 Actual: 1.5
EA 9.1 High Efficiency Appliances
Max Pts: 2 Planned: 0 Revised: 0.5 Actual: 0.5
EA 9.2 Water Efficient Clothes Washer
Max Pts: 1 Planned: 0
EA 11.1 Refrigerant Charge Test Pre-req
EA 11.2 Appropriare HVAC Refrigerant
Max Pts: 1 Planned: 1 Actual: 1
Material & Resources
Max Pts: 16 Min Pts: 2 Planned: 12.5 Actual: 10 Pre-reqs: 3 / 3
MR 1.1 Framing Order Waste Limit Factor Pre-req
Done
MR 1.2 Detailed Framing Document
Max Pts: 1 Planned: 1 Actual: 1
MR 1.3 Detailed Cut List and Order
Max Pts: 1 Planned: 1 Actual: 1
MR 2.1 FSC-Certified Tropical Wood Pre-req
Done
MR 2.2 Environmentally Preferable Products
Max Pts: 8 Planned: 8 Actual: 8
MR 3.1 Construction Waste Management Pre-req
Done
MR 3.2 Construction Waste Reduction
Max Pts: 3 Planned: 2.5
Indoor Environmental Quality
Max Pts: 21 Min Pts: 6 Planned: 11 Revised: 12 Actual: 6 Pre-reqs: 3 / 7
EQ 2.1 Basic Combustion Venting Pre-req
EQ 2.2 Enhanced Combustion Venting (Fireplace)
Max Pts: 2 Planned: 0 Actual: 1
EQ 3.1 Moisture Load Control
Max Pts: 1 Planned: 1 Actual: 1
EQ 4.1 Basic Outdoor Air Ventilation Pre-req
Done
EQ 4.2 Enhanced Outdoor Air Ventilation
Max Pts: 2 Planned: 2 Actual: 2
EQ 4.3 Third Party Testing
Max Pts: 1 Planned: 0
EQ 5.1 Basic Local Exhaust Pre-req
EQ 5.2 Enhanced Local Exhaust
Max Pts: 1 Planned: 1 Actual:1
EQ 5.3 Third Party Testing
Max Pts: 1 Planned: 0
EQ 6.1 Room by Room calculations Pre-req
Done
EQ 6.2 Return Air Flow
Max Pts: 1 Planned: 1
EQ 6.3 Third Party Testing
Max Pts: 2 Planned: 0
EQ 7.1 Good Filters
EQ 7.3 Best Filters
Max Pts: 2 Planned: 0
EQ 8.1 Indoor Contaminant Control Construction
Max Pts: 1 Planned: 1
EQ 8.2 Indoor Contaminant Control
Max Pts: 2 Planned: 0 Actual: 1
EQ 8.3 Preoccupancy Flush
Max Pts: 1 Planned: 1
EQ 9.1 Radon-Resistant Construction Pre-req
EQ 9.2 Radon-Resistant Construction: Active System
Max Pts: 1 Planned: 1
EQ 10.1 No HVAC in Garage Pre-req
Done
EQ 10.2 Minimize Pollutants from Garage
Max Pts: 2 Planned: 2
EQ 10.3 Exhaust Fan in Garage
Max Pts: 1 Planned: 0
Awareness & Education
Max Pts: 3 Min Pts: 0 Planned: 0 Actual: 0 Pre-reqs: 0 / 1
AE 1.1 Basic Operations Training - Pre-req
AE 1.2 Enhanced Training
Max Pts: 1 Planned: 0
AE 1.3 Public Awareness
Max Pts: 1 Planned: 0
Project Total
Max Pts: 136 Planned: 60 Actual: 43 Pre-reqs: 11 / 19