Our Points

This page provides an item by item summary of the different points available,  which points we planned on getting, revisions to that plan, and actual points achieved.
Innovation and Design
Max Pts: 11     Planned: 3     Actual: 0           Pre-reqs: 2/3
ID 1.1 Prelinary Rating - Prereq
Done
ID 1.2 Intergrated Project Team 
Max Pts: 1     Planned: 0
ID 1.3 LEED Professional
Max Pts: 1     Planned: 0
ID 1.4 Design Charette
Max Pts: 1     Planned: 0
ID 1.5 Building Orientation for Solar Design
Max Pts: 1     Planned: 0
ID 2.1 Durability Planning - Prereq
Done
ID 2.2 Durability Management - Prereq
On-going
ID 2.3 Third Party Durability Management Verification
Max Pts: 3     Planned: 3  

ID 3 Innovative and Regional Design
Max Pts: 4     Planned: 0

 
Location and Linkages
Max Pts: 10     Planned: 10      Actual:10           Pre-reqs: 0
LL 2.1 Site Selection
Max Pts: 2     Planned: 2     Actual: 2
LL 3.2 Infill
Max Pts: 2     Planned: 2     Actual: 2
LL 3.3 Previosuly Developped
Max Pts: 1     Planned: 1     Actual: 1
LL 4.1 Existing Infrastructure
Max Pts: 1     Planned: 1     Actual: 1
LL 5.3 Outstasning Community Resources
Max Pts: 3     Planned: 3     Actual: 3

LL 6.1 Access to Open Space
Max Pts: 1     Planned: 1     Actual: 1



Sustainable Sites
Max Pts: 22   Min Pts: 5     Planned: 12.5      Actual: 0           Pre-reqs: 0 / 2
SS 1.1 Erosion Control during Construction Pre-req

SS 1.2 Minimize Disturbed Area
Max Pts: 1     Planned: 1  

SS 2.1 No Invasive Plants Pre-req
SS 2.2 Basic Landscape Design
Max Pts: 2     Planned: 2   
SS 2.3 Limit Conventional Turf
Max Pts: 3     Planned: 1
SS 2.4 Drought Tolerant Plants
Max Pts: 2     Planned: 1
SS 3.1 Reduce Heat Island Effect
Max Pts: 1     Planned: 1
SS 4.1 Permeable Lot
Max Pts: 4     Planned 3
SS 4.2 Permanent Erosion Controls       
Max Pts: 1     Planned: 1
SS 4.3 Management of Runoff from Roof
Max Pts: 2     Planned: 1
SS 5.1 Pest Control Alternatives
Max Pts: 2     Planned: 0   Revised: 1.5
SS 6.1 - 6.3 Housing Density
Max Pts: 4     Planned: 0

Water Efficiency
Max Pts: 15   Min Pts: 3     Planned: 6      Actual: 4           Pre-reqs: 1 / 1

WE 1.1 Rainwater Harvesting & 1.2 Greywater Reuse System
Max Pts: 5     Planned: 0
WE 2.1 High Efficiency Irrigations System or 2.3 Reduce Irrigation Demand
Max Pts: 4     Planned: 0

WE 3.1 Fixture Efficiency  Pre-req
Done
WE 3.3 Very High Efficiency Fixtures
Max Pts: 6     Planned: 5    Revised: 6  Actual: 4

Energy & Atmosphere
Max Pts: 38   Min Pts: 0     Planned: 6.5      Actual: 13           Pre-reqs: 2 / 2
EA 1.1 Minimum ERS Rating of 76  Pre-req
Done
EA 1.2 Exceptional Energy Perfromance in ERS
Max Pts: 28     Planned: 6      Actual: 10
EA 7.1 Efficient Hot Water Distribution
Max Pts: 2     Planned: 0
EA 7.2 Pipe Insulation
Max Pts: 1     Planned: 1
EA 8.1 ENERGY STAR Lights Pre-req
Done
EA 8.3 Advanced Lighting
Max Pts: 3     Planned: 0  Revised: 1.5   Actual: 1.5
EA 9.1 High Efficiency Appliances
Max Pts: 2     Planned: 0  Revised: 0.5  Actual: 0.5

EA 9.2 Water Efficient Clothes Washer
Max Pts: 1     Planned: 0
EA 11.1 Refrigerant Charge Test Pre-req
EA 11.2 Appropriare HVAC Refrigerant
Max Pts: 1     Planned: 1    Actual: 1

Material & Resources
Max Pts: 16   Min Pts: 2     Planned: 12.5      Actual: 10           Pre-reqs: 3 / 3
MR 1.1 Framing Order Waste Limit Factor  Pre-req
Done
MR 1.2 Detailed Framing Document
Max Pts: 1     Planned: 1  Actual: 1
MR 1.3 Detailed Cut List and Order
Max Pts: 1  Planned: 1    Actual: 1
MR 2.1 FSC-Certified Tropical Wood  Pre-req
Done
MR 2.2 Environmentally Preferable Products
Max Pts: 8     Planned: 8     Actual: 8
MR 3.1 Construction Waste Management  Pre-req
Done
MR 3.2 Construction Waste Reduction
Max Pts: 3     Planned: 2.5

Indoor Environmental Quality
Max Pts: 21   Min Pts: 6     Planned: 11  Revised: 12     Actual: 6          Pre-reqs: 3 / 7
EQ 2.1 Basic Combustion Venting Pre-req
EQ 2.2 Enhanced Combustion Venting (Fireplace)
Max Pts: 2     Planned: 0    Actual: 1
EQ 3.1 Moisture Load Control
Max Pts: 1     Planned: 1    Actual: 1
EQ 4.1 Basic Outdoor Air Ventilation Pre-req
Done
EQ 4.2 Enhanced Outdoor Air Ventilation
Max Pts: 2     Planned: 2     Actual: 2
EQ 4.3 Third Party Testing
Max Pts: 1     Planned: 0
EQ 5.1 Basic Local Exhaust  Pre-req
EQ 5.2 Enhanced Local Exhaust
Max Pts: 1     Planned: 1   Actual:1
EQ 5.3 Third Party Testing
Max Pts: 1     Planned: 0
EQ 6.1 Room by Room calculations Pre-req
Done
EQ 6.2 Return Air Flow
Max Pts: 1     Planned: 1
EQ 6.3 Third Party Testing
Max Pts: 2     Planned: 0
EQ 7.1 Good Filters
EQ 7.3 Best Filters
Max Pts: 2     Planned: 0 
EQ 8.1 Indoor Contaminant Control Construction
Max Pts: 1     Planned: 1
EQ 8.2 Indoor Contaminant Control
Max Pts: 2     Planned: 0    Actual: 1
EQ 8.3 Preoccupancy Flush
Max Pts: 1     Planned: 1
EQ 9.1 Radon-Resistant Construction Pre-req
EQ 9.2 Radon-Resistant Construction: Active System
Max Pts: 1     Planned: 1
EQ 10.1 No HVAC in Garage  Pre-req
Done
EQ 10.2 Minimize Pollutants from Garage
Max Pts: 2     Planned: 2
EQ 10.3 Exhaust Fan in Garage
Max Pts: 1     Planned: 0
Awareness & Education
Max Pts: 3   Min Pts: 0     Planned: 0      Actual: 0           Pre-reqs: 0 / 1

AE 1.1 Basic Operations Training - Pre-req
AE 1.2 Enhanced Training
Max Pts: 1     Planned: 0
AE 1.3 Public Awareness
Max Pts: 1     Planned: 0
Project Total
Max Pts: 136    Planned: 60   Actual: 43     Pre-reqs: 11 / 19